The Challenge

Smart Commercial Energy developed a large commercial renewable energy site in Sydney featuring a 160 kW solar system, a Tesla Megapack, 15 Tesla Powerwalls, and four EV chargers. While the infrastructure was supplied by the same manufacturer, the site quickly encountered a key operational issue.

The batteries were not sequencing their charge and discharge cycles, meaning stored solar energy was not being optimised before drawing power from the grid.

Without coordinated control, the system could not fully maximise the available solar generation or the storage capacity across multiple battery assets. The client required a solution that could deliver true interoperability and intelligent energy management across all installed batteries.

The Solution

Arvio Technology installed the EJOS™ intelligent energy management system to coordinate and optimise the entire site. The system enabled seamless orchestration of all battery assets and EV charging infrastructure.

Solution Delivered

  • Automated battery sequencing to prioritise solar charging and optimise discharge before grid usage
  • Centralised control and monitoring across the Megapack, Powerwalls, and EV chargers
  • Intelligent energy management ensuring the site operates at maximum efficiency

The Result

With the EJOS™ system in place, Smart Commercial Energy achieved fully coordinated battery performance across the entire site. Solar generation is now optimally stored and deployed, reducing grid dependency and maximising energy utilisation.

The result is a high-performance, intelligently managed renewable energy ecosystem, delivering operational efficiency and a satisfied client while demonstrating the power of advanced energy orchestration.